1.
SNS EXTRACTION KICKER MAGNET WITH LOW –µ FERRITE
File Format: PDF/Adobe Acrobat - View as HTML However, kickers without external resistive damping would benefit from the use of a low-μ ferrite. I. Introduction. The transverse impedance of kicker ...
2.
BNL/SNS TECHNICAL NOTE
File Format: PDF/Adobe Acrobat - View as HTML The kicker dimensions are: h = 24.8 cm, w = 15.9 cm, l = 36 cm and t = 2.54 cm. ... In the third section, the new dimensions of the kickers are ...
3.
POWER SUPPLY SYSTEM BNL/NSNS TECHNICAL NOTE NO. 014
The NSNS main ring (MR) has to have good stability, flexibility and reliability. Thus, the power supplies (ps), that supply energy to the main dipoles and ...
4.
Labeling of Magnet Coil Leads SNS Magnet Polarity Conventions
File Format: PDF/Adobe Acrobat - View as HTML For SNS Ring and Transport System, all main magnets have their coil leads labeled as either #1 or #2. This labeling is used to indicate that the magnet ...
5.
COPPER COIL ESTIMATING SHEET -
File Format: PDF/Adobe Acrobat - View as HTML COPPER COIL ESTIMATING. SHEET -. BAF 8X20 Octupole. NO COILS/MAGNET. 8. ELECTRICAL PARAMETERS. WATER SYST PRESS. (PSI). 125. --------------------- ...
6.
D-6 Thick Septum Magnet Parameters
D-6 Thick Septum Magnet Parameters. DESCRIPTION. VALUE. UNIT. Beam Deflection Angle (@Br = 13.0 Tm/rad). 0.155 *. radian. Nominal Field. 0.88. Tesla ...
7.
Scintillator/PMT
Scintillator/PMT. • Plunging Plastic Scintillator inside Argon/CO. 2 gas volume. • Considering segmenting the scintillator for low intensity profiles. ...
8.
SNS Accumulator Ring Extraction Fast Kicker Modulator Initial ...
switch (SW), kicker inductor (L k. ) and a resistor (R). ... scale is current /100 and the horizontal scale is simulation time in µsec. The peak current ...
9.
Considerations in Designing a "Beam-In-Gap" Monitor for the ...
With a design intensity of 10. 14 per pulse, un-controlled losses must be kept to a level of 10. -4 or less. One possible loss mechanism would be from beam ...
10.
Microsoft PowerPoint - Pile RSVP AGS RSVP Meeting 26 Aug 2004.ppt
AGS RSVP Weekly Meeting. P. Pile. 26 August 2004. RSVP WBS Structure. • 1.0 RSVP Project Office. • 1.1 K0PI0. • 1.2 MECO. • 1.3 AGS ...